Community owned. Community focused. Environmentally responsible.

Connecting Your System

Interconnection Guidelines

  • Click on this outline of the entire process to access information needed to successfully install solar equipment at home and connect a distributed generation system.
     

All interconnection applications must be submitted online through PowerClerk.
Before you start, please have:

  • A system diagram (showing your equipment, meters, and disconnect switch if required)
  • A site plan (showing equipment locations and your system’s address)
  • Proof of insurance
  • Equipment certification or compliance documents
  • Manufacturer specification sheets

Required Forms (completed in PowerClerk)

  • Wisconsin Standard Distributed Generation Application
  • Supplement for Solar, Energy Storage, Wind, or Generator (as needed)
  • Interconnection Agreement

Visit PowerClerk today to begin your application.